MCC Update – November 2024

The project, now in RIBA stage 3, is proceeding at pace with numerous meetings addressing a myriad of topics taking place but, as is often the case with construction projects, the contractor has experienced some delay in getting all the quotations needed from the various sub-contractors in order to confirm the overall project cost. The…

Read More

MCC Update – October 2024

The project to build Mayfield’s combined new Community and Health Centre has now moved into what is called RIBA stage 3, which means that although the overall design and appearance remain the same as presented to the village at the 7th July Information Event, aspects such as heating and ventilation, power supplies and lighting are being…

Read More

MCC Update – September 2024

The project is now progressing with momentum as the project team spend quite a few days per week monitoring progress, providing the design detail requested by the contractor and attending progress review and workshop meetings.  The general design was shared with the public at the 7th July Information Event and for those who were unable…

Read More

MCC Update – August 2024

One hundred and fifty one parishioners turned out on the 7th July to visit Mayfield’s Scout and Guide hall where the latest floor plans, external elevations and artists’ impressions of Mayfield’s new Community and Health Centre were on display. We consider this to be not a bad turn-out since the weather for much of the day…

Read More

Car Park Closure Warning

On the Friday morning of 12 July 2024 CBR testing (California Bearing Ratio – a measure of the load bearing strength of a given surface) will be being carried out from 07.30 at Court Meadow car park therefore it will be closed. The Council apologises for the inconvenience this may cause to residents.

Read More

MCC Update – July 2024

Further to last month’s update, the architects have now completed the revisions to the community hall floor plans, which include enlarged meeting rooms and kitchen spaces, plus three sets of external double doors. We are therefore pleased to announce that a Mayfield Community and Health Centre Information Event will be held on Sunday 7th July between…

Read More

MCC Update – June 2024

As the Pre-construction Services Agreement (PCSA) was signed by Wealden District Council (WDC) and the build contractor back in March, the contractor has now appointed a team of professionals, thereby creating a design team including, in particular, the architects. Following design meetings with the contractor and architect, internal and external elevation drawings along with a…

Read More

MCC Update – May 2024

With the first stage (design) of the two stage procurement now fully underway meetings with the main contractor (Baxall Construction) and their architect have been held together with site visits. These, together with the design brief and prior feedback on the design to the architects will enable the final basic design to be produced and…

Read More

MCC Update – April 2024

A Pre-construction services agreement was signed by the build contractor in March. As a consequence, the contractor will be mobilising the design team including formally appointing the various professional consultants, and in particular the architects, which means that the real design work now begins. Design team meetings are to be held every two weeks and…

Read More