The A267 will be closed to through traffic on Monday 28 April for two nights between 8pm and 6am while a small section of the surface is repaired at the junctions of Spring Lane and Leeds Lane. Access for residents will be maintained where possible but vehicles will not be able to pass through the works.

The A267 will be closed between the A272 and Horleigh Green Road. A diversion route will be signed using Bunny Lane in Frant, the A26 and the A272.